Close Menu
PRIMA NEWSPRIMA NEWS
    What's Hot

    Money sent home by migrants nearly doubles in a decade

    September 18, 2026

    Samsung Phone Users Can Now Sync Photos and Video to Google

    September 18, 2026

    Toyin Abraham Rejects APC Campaign Council Role After Being Listed Without Her Consent

    September 18, 2026
    Facebook X (Twitter) Instagram
    PRIMA NEWSPRIMA NEWS
    Facebook X (Twitter) Instagram
    Subscribe
    • Home
    • News
      • Politics
        • Politics
        • World Politics
      • World News
        • Africa
        • Asia Pacific
        • Europe & UK
        • Middle East
      • Economy
        • Business
      • Technology
      • Metro
      • Sports
      • Entertainment
    • Prima TV
    • Prima Gallery
    • Entertainment
    • Contact
    • About Us
    PRIMA NEWSPRIMA NEWS
    Home»Politics»FG may shut Eko Bridge carriageway
    Politics

    FG may shut Eko Bridge carriageway

    Prima NewsBy Prima NewsMay 5, 2026No Comments3 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email Copy Link
    Follow Us
    Google News Flipboard
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The federal government may completely close a carriageway on the Eko Bridge in Lagos State due to damage to about eight piles.

    The Federal Controller of Works in Lagos, Olufemi Dare, disclosed this at a press conference on Tuesday in Lagos.

    He said the closure would require approval from the Minister of Works, Dave Umahi.

    “If he agrees with our recommendations, a carriageway of the bridge may be completely shut to traffic,” the official said.

    Mr Dare said the move followed a recent joint inspection of the bridge by consultants, contractors and officials from the Federal Ministry of Works, which revealed that about eight piles on the bridge were badly damaged.

    Piles are the long, deep vertical columns (concrete, steel, or wood) driven or drilled into the ground or seabed to create a strong foundation for the bridge.

    Mr Dare said that the damage of the piles posed a huge risk to users of the bridge.

    Mr Dare attributed the damage largely to activities of miners and scavengers, saying that some of the piles had lost their concrete covering, leaving only exposed reinforcement.

    He said that the minister of works would visit Lagos for a further assessment of the bridge and to take a final decision on the recommendations.

    On Carter Bridge, Mr Dare said the structure had exceeded its serviceability lifespan and had been declared irredeemable.

    He confirmed that Carter Bridge would be demolished and reconstructed.

    “It has been in the public domain that Carter bridge will be demolished.

    “It has exceeded its serviceability limit and cannot be redeemed. A new bridge will be constructed,” he said.

    He said that a rigorous bidding process involving major construction firms had been concluded on the reconstruction, with China Civil Engineering Construction Company emerging the preferred contractor.

    According to him, the minister will, during his visit, officially hand over the project to the contractor.

    Mr Dare also said the minister would inspect the Marine Bridge—where defects were recently observed despite ongoing construction—to determine necessary interventions.

    He said the minister would equally assess the Lagos-Calabar Coastal Highway project implementation.

    “The Section One of the coastal highway has reached about 98 per cent completion. Motorists can now travel about 47km from Ahmadu Bello Way to Eleko on concrete pavement,” he said.

    Mr Dare said that the minister’s visit would provide an opportunity to take critical decisions on the projects to enhance safety and improve infrastructure delivery in Lagos State.

    READ ALSO: Lagos hits N807bn revenue in early 2026, surpasses Nigeria’s subnational peers

    This is coming days after the works minister, Mr Umahi, announced the federal government’s approval of the demolition and reconstruction of the Carter Bridge at a cost of N548.98 billion, citing severe structural deterioration beneath the water.

    Mr Umahi, announced the decision last Thursday after the Federal Executive Council meeting in Abuja.

    He said multiple technical assessments conducted over more than a decade found that the bridge’s underwater piles and pile caps had deteriorated beyond repair, leaving full reconstruction as the only viable option.

    “We convocated a stakeholders’ engagement, and all the technical experts all over the country, and even internationally, all agreed that we could not redeem Carter Bridge, and it has to be completely demolished and rebuilt,” he noted.

    (NAN)

    Source link

    Ahmadu Bello way Eko bridge Eleko Lagos-Calabar Coastal Highway project.
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Prima News
    • Website

    Related Posts

    Cross River retirees appeal for pension adjustment, gratuity payment

    September 18, 2026

    From campus mud to NYSC khaki: The inspiring story of Bitrus Nwalsu

    September 18, 2026

    N.Korea leader’s sister blasts US drills, threatens ‘more offensive’ response

    September 17, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Top Trending

    Money sent home by migrants nearly doubles in a decade

    By Prima NewsSeptember 18, 2026

    These transfers, known as remittances, grew by 94 per cent between 2016…

    Samsung Phone Users Can Now Sync Photos and Video to Google

    By Prima NewsSeptember 18, 2026

    One cloud in, one cloud out. Samsung phone users can now sync…

    Toyin Abraham Rejects APC Campaign Council Role After Being Listed Without Her Consent

    By Prima NewsSeptember 18, 2026

    Toyin Abraham has rejected APC Campaign Council role after being listed without…

    Latest News

    Money sent home by migrants nearly doubles in a decade

    By Prima NewsSeptember 18, 2026

    These transfers, known as remittances, grew by 94 per cent between 2016 and 2025, far…

    Samsung Phone Users Can Now Sync Photos and Video to Google

    September 18, 2026

    Toyin Abraham Rejects APC Campaign Council Role After Being Listed Without Her Consent

    September 18, 2026

    Subscribe to News

    Get the latest sports news from NewsSite about world, sports and politics.

    Facebook X (Twitter) Pinterest Vimeo WhatsApp TikTok Instagram

    News

    • World
    • US Politics
    • EU Politics
    • Business
    • Opinions
    • Connections
    • Science

    Company

    • Information
    • Advertising
    • Classified Ads
    • Contact Info
    • Do Not Sell Data
    • GDPR Policy
    • Media Kits

    Services

    • Subscriptions
    • Customer Support
    • Bulk Packages
    • Newsletters
    • Sponsored News
    • Work With Us

    Subscribe to Updates

    Get the latest news from PRIMA NEWS about politics, art, design and business.

    © 2026 PRIMA NEWS (ISSN: 2251-1237)
    • Privacy Policy
    • Terms
    • Accessibility

    Type above and press Enter to search. Press Esc to cancel.